Course Code and Name: TCBE 3103 CONSTRUCTION TECHNOLOGY IIILevel: YEAR THREE SEMESTER I Credit Units: 3 Contact Hours: 45
Course Description This course introduces advanced principles and techniques in construction technology and the use of construction plant. It examines setting out and construction of buildings of complicated shapes and other civil engineering structures.
Course Objectives: The course aims to provide the students with knowledge that: • Explain the fundamental aspects of construction of Roads Bridges, Tunnels, setting out using Theodolite, mechanical plant operation and maintenance • Highlight the various skills in the Public Safety Act.
Learning Outcomes: Upon completion of the course, the students should be able to: • Operate and maintain Mechanical Plants. • Design Formwork. • Discuss how to differentiate between forms of labour technologies. • Exhibit skills in safety management during site visitor.
Detailed course outline Building Rules (The Public Safety Act) Site Visits: Site visit for selection by the client Considerations affecting choice of site Primary and secondary investigation by the consultants and contractor Site Layout: Location temporary buildings, services, access, outlets and areas (1hour) Submission and Approval of Plans Setting Out Using More Precise and Latest Equipment: Setting out hexagonal buildings, bridges and roads using theodilite, EDMs, Total stations etc. Setting out circular, triangular, ellliptical and other non-square buildings Setting out over water Setting out of bridges, dams and tunnels. Temporary Works Design: Factors considered in design Design of props, Primary and secondary joists Design of formwork for different Architectural shapes and details Sliding formwork Advanced Construction: Factors considered in the design of: roads, bridges, dams and tunnels Construction of roads, bridges and tunnels Offshore construction Stairs and Escalators: Setting out and construction of stairs Construction of spiral stairs in concrete and in steel, prefabrication of spiral stairs Installation of escalators Special Constructions: Sound, Fire, Heat, Cavity Floors and walls. Suspended Ceiling: functional requirements Methods of construction: jointless, strip and service ceiling. Curtain Walling: design of curtain walls methods of construction: unitised and rainscreen principle Underpinning: Factors considered in the choice of the method to use Methods of underpinning Traditional continuous footing (strip concrete or masonry building) Pynford stools (modification of 1) Mini-pile or conventional piling Grouting Mechanisms of Door Openings: Sliding doors Folding doors Collapsible doors Louvred Revolving doors Sliding and folding Swinging doors Maintenance of Structures: Definition of terms types of maintenance importance Protection of Structures Industrialised and System Building Construction: definition of industrialisation reasons for industrialisation classification of industrialisation: onsite and offsite and product industrialisation key factors of industrialisation advantages and disadvantages of industrialisation Limitations in Uganda's Rural and Urban Areas, Appropriate Solutions to Identified Limitations Appropriate Technology Considerations and alternative energy Construction Mechanical Plant: methods of excavation factors considered in acquiring a plant choice of excavation method classification of mechanical plant advantages and disadvantages of mechanical plant (Details of Sketches Must Be Emphasised in This Course.)